Pendent Tube Alignment Methods

Thru-bolt split ring and tube alignment castings.

Pendant Tube Alignment
The patented “Thru-Bolt” system developed by Power & Industrial Services for split ring tube alignment castings can be installed by a single person in far less time than required by standard procedures requiring two or more people or use of come-a-longs to pull tubes into alignment. Download Brochure »

p&i_tac_leveling_lug

TAC Leveling Lug


A: 3" High / Heavy-Duty  B: 2" High / Standard

A: 3″ High / Heavy-Duty B: 2″ High / Standard

A: 2" High Standard Casting  B: 3" High Heavy-Duty Casting

A: 2″ High Standard Casting B: 3″ High Heavy-Duty Casting

Features & Benefits

  • Our castings come in either standard 2″ high or heavy-duty 3″ high. Power & Industrial Services can recommend an alloy based on your needs
  • Benefits of 3″ heavy-duty castings
    • Provides additional strength
    • Particularly in longer castings where capturing more tubes in one casting can cause additional casting stress
    • Provides more material to withstand extreme operating temperatures

 

U-Clamp and Alignment Bars

A: 235MA Bar  B: Cast U-Clamps Bolt to Bar, No Welding to the Tubes

A: 235MA Bar          B: Cast U-Clamps Bolt to Bar, No Welding to the Tubes

Bolt-on U-Clamp and Bar

B: Cast U-Clamps Bolt to Bar, No Welding to the Tubes                       Bolt-on U-Clamp and Bar

Our new U-Clamp and bar alignment method offers the fastest and most secure method of aligning pendant rows without having to weld to your tubes. This eliminates potential tube leaks.
U-Clamp Inventory

U-Clamp Inventory

Pendent Tube Alignment Castings

Fast Delivery and U-Clamps and Alignment Bars

Pendent Tube Alignment Castings Custom designed tube alignment methods available. Specify—tube size—centers—number of tubes to be contained.

 

Custom & Standard O.E.M. Styles

Customed designed tube alignment methods available. Specify – tube size – Centers – number of tubes to be contained.

Alignment Bar & Clip

Alignment Bar & Clip

D-Links

D-Links

Tube Support Lugs

Tube Support Lugs

Thru-Bolt Tube Align. End Cap

Thru-Bolt Tube Align. End Cap

Thru-Bolt TAC with Weld Tab

Thru-Bolt TAC with Weld Tab

Vertical/Horizontal Casting

Vertical/Horizontal Casting

Spacer Lugs

Spacer Lugs

Slip Spacers

Slip Spacers

Buck Stays

Buck Stays

End Caps

Used to Prevent Gas Stream Erosion of Tube Alignment Welds

Installed On Platen Sections - End Caps 3 Tube TAC 1-Vertical / 2-Horizontal Casting
End Caps - 2 Tube TAC 2 Tube TAC 1 Tube vertical / 1 Tube horizontal casting
End Caps - 4 Tube TAC 4 Tube TAC 3 Tube vertical / 1 Tube horizontal casting
Installed On Platen Sections Installed on Platen Sections
end-caps5 3 Tube Casting – 1 vertical / 2 Tube horizontal casting